Abstract
When forecasting intermittent demand the method derived by Croston (1972) is often cited. Previous research favorably compared Croston's forecasting method for demand with simple exponential smoothing assuming a nonzero demand occurs as a Bernoulli process with a constant probability. In practice, however, the assumption of a constant probability for the occurrence of nonzero demand is often violated. This research investigates Croston's method under violation of the assumption of a constant probability of nonzero demand. In a simulation study, forecasts derived using single exponential smoothing (SES) are compared to forecasts using a modification of Croston's method utilizing double exponential smoothing to forecast the time between nonzero demands assuming a normal distribution for demand size with different standard deviation levels. This methodology may be applicable to forecasting intermittent demand at the beginning or end of a product's life cycle.
Original language | Undefined/Unknown |
---|---|
Journal | Faculty Publications |
State | Published - Jan 1 2008 |